Build Log: March 2012 Summary

March saw the installation of the heater and wipers as well as the fabrication of a “doghouse” that goes over the passenger footbox and houses the heater - keeping it out of sight. I also finished routing the fuel lines, fashioned some footbox vent scoops in the transmission tunnel, riveted the cockpit aluminum in place and installed the steering shaft. I ended the month preparing the engine bay aluminum fot paint and got as far as priming them.

[Home] [The Kit] [The Build...] [Cobra-Cam] [Tutorials] [Comments]